ARGENTINA
+54.11.5219.1230
BRAZIL
+55.11.5102.3844
CHINA
+86.10.8391.4006
INDIA
+91.11.4053.2199
UKRAINE
+380.44.279.2435
UNITED STATES
+1.786.425.9251
Call Us
Our Services

New Methodology Creation

Whenever a project is the first of its kind, regulatory authorities require that the project sponsor develops a new baseline and monitoring methodology in order for the project to be considered for approval in reputable compliance, pre-compliance and voluntary market frameworks.

In the development of new methodologies, MGM is proud to be among the most experienced companies in the industry, both in terms of the number and variety of projects for which we have developed new methodologies.

The following methodologies, created by MGM International™'s technical experts, have become the basis for hundreds of projects developed around the world:

Methodologies

  • AM0008 Industrial fuel switching from coal and petroleum fuels to natural gas without extension of capacity and lifetime of the facility.
  • AM0014 Natural gas-based package cogeneration.
  • AM0030 PFC emission reductions from anode effect mitigation at primary aluminum smelting facilities.
  • AM0034 Catalytic reduction of N2O inside the ammonia burner of nitric acid plants.
  • AM0040 Baseline and monitoring methodology for project activities using alternative raw materials that contain carbonates in clinker manufacturing in cement kilns.
  • AM0043 Leak reduction from a natural gas distribution grid by replacing old cast iron pipes or steel pipes without cathodic protection with polyethylene pipes.
  • AM0063 Recovery of CO2 from tail gas in industrial facilities to substitute the use of fossil fuels for production of CO2.
  • ACM009 Consolidated methodology for industrial fuel switching from coal or petroleum fuels to natural gas.
METHODOLOGY PROJECTS
Click on the projects on the rotating globe to display project information


2009 MGM International. All rights Reserved